Severnside Energy Recovery Centre: Difference between revisions

Imported from text file
 
Arctellion (talk | contribs)
No edit summary
 
(16 intermediate revisions by 5 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{#vardefine:epr|ZP3937KL}}
{{EfWTemplate|EPR=ZP3937KL|id=12}}
[[Category:EfW Plants]]
 
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. {{EfWTemplate|EPR={{#var:epr}}|id=12}}
[[File:Suez Severside.png|350px|left|Suez Severnside (SERC)  Site]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].


==History==
==History==
The Riverside ERC was built primarily to service a 25 year [[PPP]] contract signed in 2013 with [[West London Waste Disposal Authority| WLWA]] <ref>[https://www.letsrecycle.com/news/latest-news/suez-milestone-severnside-erf/ Letsrecycle Article]</ref>, with anticipated input of around 300,000 tonnes per annum i.e the majority of the tonnage. Additional tonnage has also been secured from the [[West of England Partnership]] and [[Devon County Council]].The [[Residual Waste]] from [[West London Waste Disposal Authority| WLWA]] is loaded at two rail-linked transfer stations in Brentford and South Ruislip  prior to its transport to Severnside ERC.
In January 2020 [[Suez]] requested an alteration to the facilities [[Environmental Permit]] seeking a 100,000 tonne per year increase to its processing capacity. If successful the plant will, in the future, be able to process 500,000 tonnes per year. <ref>https://www.endswasteandbioenergy.com/article/1670740/suez-expand-severnside-efw-plant</ref>


==Plant==
==Plant==
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract and was delivered in 2016 at a GBP £240m capital cost.
The plant comprises 2 lines of 21.85 tonnes/hour (maximum 24.24 tonnes/hour) design capacity capable of treating 350,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 7.5 and 12.5MJ/kg to deliver 37.5MWe of power <ref>[https://www.hz-inova.com/projects/severnside-uk/ Hitachi Zosen Inova Website]</ref>. Operating at the maximum design tonnes/ hour figure would result in a capacity close to 400,000 tonnes per annum, but this would require a low [[CV]].


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
 
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />