Severnside Energy Recovery Centre: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[File:Suez Severside.png|350px|left|Suez Severnside (SERC) Site]] | [[File:Suez Severside.png|350px|left|Suez Severnside (SERC) Site]] | ||
[[Category:EfW Plants | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR=ZP3937KL|id=12}} | {{EfWTemplate|EPR=ZP3937KL|id=12}} | ||
Revision as of 20:51, 1 March 2020
Severnside Energy Recovery Centre Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | ZP3937KL |
Operator | SUEZ |
Region | South West |
Operational Capacity | 467ktpa |
Is site R1? | fal |
When was R1 Granted? | 2016-08-03 |
What was the R1 value | 0.86 |
Electrical Capacity | 36.00MWe |
Number of Lines | 2 |
Number of Turbines | 1 |
CHP | No |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 298312.30 | 0.00 | 0.00 | 40606.46 | 340422.37 |
2018 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2019 | 124845.00 | 272498.00 | 0.00 | 0.00 | 397343.00 |
2020 | 311482.00 | 105564.00 | 0.00 | 0.00 | 417046.00 |
2021 | 299078.00 | 102532.00 | 1.00 | 0.00 | 401611.00 |
2022 | 64158.00 | 36497.00 | 0.00 | 285406.00 | 386061.00 |
2023 | 64535.00 | 37605.00 | 0.00 | 300953.00 | 403093.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 73059.00 | 21.46% | 9463.00 | 2.78% |
2018 | 0.00 | 0.00% | 0.00 | 0.00% |
2019 | 70380.00 | 17.71% | 9883.00 | 2.49% |
2020 | 67768.00 | 16.25% | 10260.00 | 2.46% |
2021 | 81788.00 | 20.36% | 9253.00 | 2.30% |
2022 | 60304.00 | 15.62% | 9203.00 | 2.38% |
2023 | 66495.00 | 16.50% | 9592.00 | 2.38% |
Summary
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by West London Energy Recovery Ltd a company set up for the purpose by Suez. Delivery of waste is primarily by rail and the facility processes primarily residual Household Waste and some Commercial Waste.
History
The Riverside ERC was built primarily to service a 25 year PPP contract signed in 2013 with WLWA [1], with anticipated input of around 300,000 tonnes per annum i.e the majority of the tonnage. Additional tonnage has also been secured from the West of England Partnership and Devon County Council.The Residual Waste from WLWA is loaded at two rail-linked transfer stations in Brentford and South Ruislip prior to its transport to Severnside ERC.
In January 2020 Suez requested an alteration to the facilities Environmental Permit seeking a 100,000 tonne per year increase to its processing capacity. If successful the plant will, in the future, be able to process 500,000 tonnes per year. [2]
Plant
Built by Hitachi Zosen Inova under a Design & Build EPC-turnkey contract and was delivered in 2016 at a GBP £240m capital cost. The plant comprises 2 lines of 21.85 tonnes/hour (maximum 24.24 tonnes/hour) design capacity capable of treating 350,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam. It is configured to run on residual Household Waste and Commercial Waste with a CV of between 7.5 and 12.5MJ/kg to deliver 37.5MWe of power [3]. Operating at the maximum design tonnes/ hour figure would result in a capacity close to 400,000 tonnes per annum, but this would require a low CV.
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|---|
Bath and North East Somerset Council | 20288.910 |
Blaenau Gwent CBC | 32.360 |
Bournemouth, Christchurch and Poole Council | 36.780 |
Bridgend CBC | 223.740 |
Bristol City Council | 27551.930 |
Canterbury City Council | 90.810 |
Carmarthenshire County Council | 12.830 |
Ceredigion County Council | 6.324 |
City and County of Swansea | 121.980 |
Isle of Wight Council | 1866.520 |
Monmouthshire CC | 50.140 |
North Somerset Council | 27.590 |
Pembrokeshire County Council | 792.140 |
Powys County Council | 13.738 |
South Gloucestershire Council | 618.490 |
Torfaen CBC | 30.220 |
Tower Hamlets LB | 7003.047 |
Vale of Glamorgan Council | 238.870 |
West London Waste Authority | 288802.640 |
Westminster City Council | 3122.320 |