Severnside Energy Recovery Centre: Difference between revisions

Bin52 (talk | contribs)
m add new link
Arctellion (talk | contribs)
Updated to new format
Line 1: Line 1:
[[File:Suez Severside.png|350px|left|Suez Severnside (SERC)  Site]]
{{#vardefine:epr|ZP3937KL}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=ZP3937KL|id=12}}
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. {{EfWTemplate|EPR={{#var:epr}}|id=12}}


[[File:Suez Severside.png|350px|left|Suez Severnside (SERC)  Site]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].  
Line 16: Line 19:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='ZP3937KL'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />