Severnside Energy Recovery Centre

Revision as of 10:07, 22 April 2021 by Arctellion (talk | contribs) (Updated to new format)

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by West London Energy Recovery Ltd a company set up for the purpose by Suez. Delivery of waste is primarily by rail and the facility processes primarily residual Household Waste and some Commercial Waste.

Severnside Energy Recovery Centre
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence ZP3937KL
Operator SUEZ
Region South West
Operational Capacity 467ktpa
Is site R1? fal
When was R1 Granted? 2016-08-03
What was the R1 value 0.86
Electrical Capacity 36.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 298312.30 0.00 0.00 40606.46 340422.37
2018 0.00 0.00 0.00 0.00 0.00
2019 124845.00 272498.00 0.00 0.00 397343.00
2020 311482.00 105564.00 0.00 0.00 417046.00
2021 299078.00 102532.00 1.00 0.00 401611.00
2022 64158.00 36497.00 0.00 285406.00 386061.00
2023 64535.00 37605.00 0.00 300953.00 403093.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 73059.00 21.46% 9463.00 2.78%
2018 0.00 0.00% 0.00 0.00%
2019 70380.00 17.71% 9883.00 2.49%
2020 67768.00 16.25% 10260.00 2.46%
2021 81788.00 20.36% 9253.00 2.30%
2022 60304.00 15.62% 9203.00 2.38%
2023 66495.00 16.50% 9592.00 2.38%

Suez Severnside (SERC) Site
Suez Severnside (SERC) Site


Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by West London Energy Recovery Ltd a company set up for the purpose by Suez. Delivery of waste is primarily by rail and the facility processes primarily residual Household Waste and some Commercial Waste.

History

The Riverside ERC was built primarily to service a 25 year PPP contract signed in 2013 with WLWA [1], with anticipated input of around 300,000 tonnes per annum i.e the majority of the tonnage. Additional tonnage has also been secured from the West of England Partnership and Devon County Council.The Residual Waste from WLWA is loaded at two rail-linked transfer stations in Brentford and South Ruislip prior to its transport to Severnside ERC.

In January 2020 Suez requested an alteration to the facilities Environmental Permit seeking a 100,000 tonne per year increase to its processing capacity. If successful the plant will, in the future, be able to process 500,000 tonnes per year. [2]

Plant

Built by Hitachi Zosen Inova under a Design & Build EPC-turnkey contract and was delivered in 2016 at a GBP £240m capital cost. The plant comprises 2 lines of 21.85 tonnes/hour (maximum 24.24 tonnes/hour) design capacity capable of treating 350,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam. It is configured to run on residual Household Waste and Commercial Waste with a CV of between 7.5 and 12.5MJ/kg to deliver 37.5MWe of power [3]. Operating at the maximum design tonnes/ hour figure would result in a capacity close to 400,000 tonnes per annum, but this would require a low CV.

Local Authority Users

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 350,931.38t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage
Bath and North East Somerset Council 20288.910
Blaenau Gwent CBC 32.360
Bournemouth, Christchurch and Poole Council 36.780
Bridgend CBC 223.740
Bristol City Council 27551.930
Canterbury City Council 90.810
Carmarthenshire County Council 12.830
Ceredigion County Council 6.324
City and County of Swansea 121.980
Isle of Wight Council 1866.520
Monmouthshire CC 50.140
North Somerset Council 27.590
Pembrokeshire County Council 792.140
Powys County Council 13.738
South Gloucestershire Council 618.490
Torfaen CBC 30.220
Tower Hamlets LB 7003.047
Vale of Glamorgan Council 238.870
West London Waste Authority 288802.640
Westminster City Council 3122.320

References