An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>.
 
{{EfWTemplate|EPR={{#var:epr}}|id=4}}
[[File:Ferrybridge 1.png|230px|left|Ferrybridge 1]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>.
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>.
Line 13: Line 15:
==Plant==
==Plant==
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract and was delivered in August 2015 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ferrybridge-multifuel-plant-begins-burning-waste/ Letsrecycle Article]</ref> GBP £300m capital cost.
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract and was delivered in August 2015 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ferrybridge-multifuel-plant-begins-burning-waste/ Letsrecycle Article]</ref> GBP £300m capital cost.
The plant comprises 2 lines of 31.3 tonnes/hour (maximum 42.2 tonnes/hour) design capacity capable of treating 513,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate AR123-120120, generating super-heated steam, and is configured to run on residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] with a [[CV]] of between 8.5 and 16.5MJ/kg to deliver 67.8MWe of power <ref>[https://www.hz-inova.com/files/2015/07/Ferrybridge_Online_E.pdf Hitachi Zosen Inova pdf]</ref>. Operating at the higher tonnes/ hour figure would result in a capacity close to 690,000 tonnes per annum, but this would require a low [[CV]].
The plant comprises 2 lines of 31.3 tonnes/hour (maximum 42.2 tonnes/hour) design capacity capable of treating 513,000 tonnes per annum via standard combustion technology, air cooled, [[Hitachi Zosen Inova]] [[Grate]] AR123-120120, generating super-heated steam, and is configured to run on residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] with a [[CV]] of between 8.5 and 16.5MJ/kg to deliver 67.8MWe of power <ref>[https://www.hz-inova.com/files/2015/07/Ferrybridge_Online_E.pdf Hitachi Zosen Inova pdf]</ref>. Operating at the higher tonnes/ hour figure would result in a capacity close to 690,000 tonnes per annum, but this would require a low [[CV]].


==Local Authority Users==
==Local Authority Users==
Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1.
Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1.
 
{{EfWLAData|EPR={{#var: epr}}}}
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='SP3239FU'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}


==References==
==References==
<references />
<references />