Ferrybridge Multifuel 1 (FM1): Difference between revisions
m minor text change |
Arctellion (talk | contribs) |
||
| (6 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine: epr|SP3239FU}} | |||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=4}} | |||
[[File:Ferrybridge 1.png|230px|left|Ferrybridge 1]]__TOC__ | |||
<br clear='left' /> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>. | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>. | ||
| Line 13: | Line 15: | ||
==Plant== | ==Plant== | ||
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract and was delivered in August 2015 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ferrybridge-multifuel-plant-begins-burning-waste/ Letsrecycle Article]</ref> GBP £300m capital cost. | Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract and was delivered in August 2015 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ferrybridge-multifuel-plant-begins-burning-waste/ Letsrecycle Article]</ref> GBP £300m capital cost. | ||
The plant comprises 2 lines of 31.3 tonnes/hour (maximum 42.2 tonnes/hour) design capacity capable of treating 513,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate AR123-120120, generating super-heated steam, and is configured to run on residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] with a [[CV]] of between 8.5 and 16.5MJ/kg to deliver 67.8MWe of power <ref>[ | The plant comprises 2 lines of 31.3 tonnes/hour (maximum 42.2 tonnes/hour) design capacity capable of treating 513,000 tonnes per annum via standard combustion technology, air cooled, [[Hitachi Zosen Inova]] [[Grate]] AR123-120120, generating super-heated steam, and is configured to run on residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] with a [[CV]] of between 8.5 and 16.5MJ/kg to deliver 67.8MWe of power <ref>[https://www.hz-inova.com/files/2015/07/Ferrybridge_Online_E.pdf Hitachi Zosen Inova pdf]</ref>. Operating at the higher tonnes/ hour figure would result in a capacity close to 690,000 tonnes per annum, but this would require a low [[CV]]. | ||
==Local Authority Users== | ==Local Authority Users== | ||
Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1. | Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1. | ||