Ferrybridge Multifuel 1 (FM1): Difference between revisions

Arctellion (talk | contribs)
No edit summary
No edit summary
Line 16: Line 16:
Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1.
Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1.


The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
{{#get_db_data: db=engy