Residual Waste EFW: Difference between revisions
mNo edit summary |
Arctellion (talk | contribs) |
||
| Line 144: | Line 144: | ||
==In Planning EfW== | ==In Planning EfW== | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy |from=efwdb |where=status='Planning' |data=site=site,id=id,cap=cap}} | {{#get_db_data: db=engy |from=efwdb |where=status='Planning' and cap > 0 |data=site=site,id=id,cap=cap}} | ||
The following list summarizes all [[EfW]] sites that were in the planning process as at January 2020, with summary capacity shown in the table. In some cases planned capacity replaces existing sites, and no comment or note is made on those plants whose planning consent may have expired due to not being implemented within consented time limits, or the likelihood of them moving from this stage into construction. | The following list summarizes all [[EfW]] sites that were in the planning process as at January 2020, with summary capacity shown in the table. In some cases planned capacity replaces existing sites, and no comment or note is made on those plants whose planning consent may have expired due to not being implemented within consented time limits, or the likelihood of them moving from this stage into construction. | ||
[[File:Efwplan.png|600px|right|EfW Sites within UK in Planning]] | [[File:Efwplan.png|600px|right|EfW Sites within UK in Planning]] | ||