Residual Waste EFW: Difference between revisions

Bin52 (talk | contribs)
m minor text changes
Bin52 (talk | contribs)
m minor text changes
Line 125: Line 125:
The following list summarizes all [[EfW]] sites that were under construction January 2020, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity.
The following list summarizes all [[EfW]] sites that were under construction January 2020, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity.


In addition there are some plants below which are reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not in construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68.  
In addition there are some plants below which are reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not thought to be under construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68.  


[[File:Under Construction EfW UK.png|600px|right|Under Construction EfW within the UK.]]
[[File:Under Construction EfW UK.png|600px|right|Under Construction EfW within the UK.]]