==Growth in Residual Waste [[EfW]]== | ==Growth in Residual Waste [[EfW]]== | ||
Historically, the UK has been very dependent on [[Landfill]] or [[Incineration]] | Historically, the UK has been very dependent on [[Landfill]] or [[Incineration without Energy Recovery]] for [[Disposal]] of [[Residual Waste]]. The landfill diversion targets set in the mid 1990s promoted [[EfW]] developments. The diversion of residual waste away from [[Landfill]] and into [[EfW]] processes reduces emissions of methane and pollution originating from [[Landfill]] sites and increases production of renewable energy<ref name="foo" />. [[Energy from Waste]] is the now the main method for dealing with [[Residual Waste]], with [[Landfill]] of [[Residual Waste]] being the least preferred method, as outlined in the [[Waste Hierarchy]]<ref name="foo" />. | ||
In 2019, the amount of residual waste that was sent to EfW processes in the UK increased by 9.9%, amounting to a total of 12.6 million tonnes being sent to 48 operational EfW facilities across the UK<ref name="foo2> [https://www.tolvik.com/wp-content/uploads/2020/05/Tolvik-UK-EfW-Statistics-2019-Report-published-May-2020.pdf Derived from Tolvik EFW Statistics 2019, Published May 2020]</ref>. This is against a headline/plated capacity of 15,400,000 tonnes of operational capacity and a further 3,900,000 tonnes of late stage commissioning and in construction 'plated' capacity. This represented 45.5% of the total [[Residual Waste]] produced in the UK in 2019 (increasing from 41.8% in 2018)<ref name="foo2" />. The total net power exported from EfW facilities in 2019 was 6,703 GWh, this supplied 2.0% of the total UK power generation, and gives an average of 531 kWh of power generated per tonne of residual waste treated at UK EfW facilities<ref name="foo2" />. | In 2019, the amount of residual waste that was sent to EfW processes in the UK increased by 9.9%, amounting to a total of 12.6 million tonnes being sent to 48 operational EfW facilities across the UK<ref name="foo2> [https://www.tolvik.com/wp-content/uploads/2020/05/Tolvik-UK-EfW-Statistics-2019-Report-published-May-2020.pdf Derived from Tolvik EFW Statistics 2019, Published May 2020]</ref>. This is against a headline/plated capacity of 15,400,000 tonnes of operational capacity and a further 3,900,000 tonnes of late stage commissioning and in construction 'plated' capacity. This represented 45.5% of the total [[Residual Waste]] produced in the UK in 2019 (increasing from 41.8% in 2018)<ref name="foo2" />. The total net power exported from EfW facilities in 2019 was 6,703 GWh, this supplied 2.0% of the total UK power generation, and gives an average of 531 kWh of power generated per tonne of residual waste treated at UK EfW facilities<ref name="foo2" />. | ||