Ardley EfW

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Ardley has a permitted capacity of 378,000 tonnes per year and is operated by Viridor.

Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1].

Image

Site Details

Operator Viridor
Site Ardley EfW
Site Size Large
Permit No UP3005LJ
Plated Capacity 378000
Status Operational

Plant Description

Built by a JV between CNIM and Clugson under a Design & Build EPC-turnkey contract which started in March 2011 and was delivered in November 2014 at a reported [2] £220m capital cost.

The plant comprises 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual Household Waste.

History

The Ardley facility was built primarily to service a 25 year PPP contract signed in March 2011 with Oxfordshire County Council, with anticipated total throughput of up to 326,000 tonnes per annum - receiving additional residual Commercial Waste and some Household Waste from other local authorities.

It is located on Viridor's Landfill near Bicester, close to the M40, and with the opening of the facility Viridor announced the closure of the adjacent Landfill in 2014.

In December 2025 Equitix increased their stake in Viridor with a path to acquire 50% of the business[3].

SED QUIS SAGITTIS 22/23 23/24 24/25
SED SED PLACERAT EST
Quisque elementum velit 84 82 79
Eros pellentesque ornare 237 241 241
Phasellus eget mauris 87.40 91.20 93.10
Vestibulum aliquet ante in nisi 112 118 121
SED RHONCUS SEM
Vestibulum vel finibus dui 3 3 4
Morbi finibus turpis ut EfW EfW EfW
Vestibulum vel finibus dui Low Low Medium
Morbi finibus turpis ut 84 82 79
PRAESENT IN ULLAMCORPER ENIM
Efficitur nulla eget 42.1 43.8 44.2
Ante in nisi consequat ultricies 459 451 444
Ed erat augue, elementum nec Top 20% Top 22% Top 19%
Subscriber content

Unlock industry insights

Subscribe for greater access to content. A minimum of a Free Public account is required, which includes access to:

  • Platform-wide navigation and core pages
  • WikiWaste Search - Intelligent search across the full dataset
  • Interactive infrastructure satellite maps
  • Infrastructure listings and associated data
  • Ranked performance of 300+ local authorities