Dudley EfW

An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status.

The facility is operated by FCC following its aquisition of Urbaser in 2023. Delivery of waste is by road and the facility processes primarily residual Household Waste

Image

Site Details

Operator FCC Environment
Site Dudley EfW
Size Medium
Permit No HP3247QS
Plated Capacity 105
Status Operational

Plant Description

The plant comprises two lines via standard combustion CNIM grate and boilers, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe[3].

History

The Dudley facility was built to primarily service residual Household Waste from Dudley Council under a long term PPP contract and has been operational since 1998.

The facility was operated by MES Environmental, part of Paprec, having agreed to buy out CNIM in March 2021[1]. At that time the plant was operated by North Midlands Operations Ltd (a subsidiary of Cobalt Energy)[2][3].

In early 2024 a contract was awarded [3] for the operation of the facility to Urbaser (which was subsequently acquired by FCC) [4].

Unlock Industry Insights

This section contains premium analytics including facility performance trends and benchmarking.

References:

  1. CNIM Press Release March 2021
  2. Annual Report 2022
  3. Compnaies House Beta
  4. Dudley MBC Press Release Feb 2023