Hill Barton EfW
An EfW facility based upon gasification, Hill Barton has a permitted capacity of 87,000 tonnes per year.
The plant is located at Hill Barton Business Park, near Exeter.

Site Details
| Operator | Exeter Waste to Energy Ltd |
|---|---|
| Site | Hill Barton EfW |
| Size | Small |
| Permit No | EP3105BJ |
| Plated Capacity | 87 |
| Status | Under Construction |
Plant Description
The plant is based on 2 lines of gasification technology, each with a capacity of 43,500 tonnes a year each[1].
It is understood to have one line in advanced commissioning.
History
The site gained planning consent in 2005 and had a number of vairations since[2].
The permit was granted in July 2021 to Exeter Waste to Energy Ltd (ultimately owned by AE Stuart, owners of the Busness Park[3]) and is to receive pre-pared RDF[1] understood to come from an adjacent associated business.
References:
- Permit and Permit Decision Document
- Devon DMC Meeting Minutes April 2023
- Companies House Beta