Hill Barton EfW

An EfW facility based upon gasification, Hill Barton has a permitted capacity of 87,000 tonnes per year.

The plant is located at Hill Barton Business Park, near Exeter.

Image

Site Details

Operator Exeter Waste to Energy Ltd
Site Hill Barton EfW
Size Small
Permit No EP3105BJ
Plated Capacity 87
Status Under Construction

Plant Description

The plant is based on 2 lines of gasification technology, each with a capacity of 43,500 tonnes a year each[1].

It is understood to have one line in advanced commissioning.

History

The site gained planning consent in 2005 and had a number of vairations since[2].

The permit was granted in July 2021 to Exeter Waste to Energy Ltd (ultimately owned by AE Stuart, owners of the Busness Park[3]) and is to receive pre-pared RDF[1] understood to come from an adjacent associated business.

References:

  1. Permit and Permit Decision Document
  2. Devon DMC Meeting Minutes April 2023
  3. Companies House Beta