Medworth EFW
An EfW facility based upon conventional combustion technology, Medworth EfW (also known as Wisbech EfW) has permitted capacity of 626,500 tonnes per year.
The site is located in Wisbech, Cambirdgeshire.

Site Details
| Operator | MVV Environment |
|---|---|
| Site | Medworth EfW |
| Size | Extra Large |
| Permit No | HP3441QA |
| Plated Capacity | 625.6 |
| Status | Under Construction |
Plant Description
The plant is to be delivered by Kanadevia Invoa under a Design & Build EPC-turnkey contract using standard combustion technology[3].
The technology is a 2 line moving grate solution by Kandovia Inova[3][4].
History
Developed by MVV UK, the plant was consented under a DCO in February 2024.
The plant commenced construction in February 2025 with operation due to commence in 3 years time[2].
The plant is intended to run on residual Household Waste and Commercial Waste, wiith a focus on RDF[2].