Tyrone Energy

Tyrone Energy is permitted to process up to 25,000 tonnes per year of waste wood generating up to 2.7MWe to the grid.

The facility is located near Artigarvan in Northern Ireland.

Image

Site Details

Operator Tyrone Energy
Site Tyrone Energy
Permit No PO373/11A
Plated 25000
Status Operational

Plant Description

The plant is based on standard combustion technology via a stepped grate technology[1][4].

History

The Tyrone site was developed by Tyrone Energy Ltd and was operational in late 2014, built at a cost of £9.5m[1][2]

It was reported in September 2022 that the business was acquired by Beauparc (now rebranded Panda)[3].

Unlock Industry Insights

This section contains premium analytics including facility performance trends and benchmarking.