Non-Hazardous Landfill: Difference between revisions

 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:Technologies & Solutions]]
[[Category:Technologies & Solutions]]
Only a [[Non-Hazardous Landfill]] can accept [[Non-Hazardous Waste]] which includes [[Municipal Solid Waste]] (MSW) and any other [[Non-Hazardous Waste]] of a similar nature that meets the relevant [[Waste Acceptance Criteria]]. They can also accept [[Inert Waste]] and [[Stabilised Non-Reactive Hazardous Waste]] (SNRHW), for example those vitrified or solidified<ref>Defra, 2010. [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/69347/pb13563-landfill-directive-100322.pdf Environmental Permitting Guidance: The Landfill Directive for the Environmental Permitting (England and Wales) Regulations 2010. London: Department for Environment, Food and Rural Affairs], p.7.</ref>.
Only a [[Non-Hazardous Landfill]] can accept [[Non-Hazardous Waste]] which includes [[Municipal Solid Waste]] (MSW) and any other [[Non-Hazardous Waste]] of a similar nature that meets the relevant [[Waste Acceptance Criteria]] ([[WAC]]).


==Capacity Non-Hazardous Landfill==
==Arrangements==
Only a [[Non-Hazardous Landfill]] can accept [[Non-Hazardous Waste]] which includes [[Municipal Solid Waste]] (MSW) and any other [[Non-Hazardous Waste]] of a similar nature that meets the relevant [[Waste Acceptance Criteria]]. They can also accept [[Inert Waste]] and [[Stabilised Non-Reactive Hazardous Waste]] (SNRHW), for example those vitrified or solidified<ref>Defra, 2010. [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/69347/pb13563-landfill-directive-100322.pdf Environmental Permitting Guidance: The Landfill Directive for the Environmental Permitting (England and Wales) Regulations 2010. London: Department for Environment, Food and Rural Affairs], p.7.</ref>. The WikiWaste page '''[[Landfill]]''' frames these types of sites and puts them into a wider context.
 
==Non-Hazardous Landfill Capacity (Void)==
===England===
The capacity of Non-Hazardous Landfill is reported<ref>[https://data.gov.uk/dataset/237825cb-dc10-4c53-8446-1bcd35614c12/remaining-landfill-capacity EA Remaining Landfill Capacity]</ref> by the [[EA]] for England and is summarised in the graph and table below, but it excludes that capacity of Non-Hazardous Landfill with a Stabilised Non-Reactive Hazardous Waste cell (which comprised 89.4 million cubic metres in 2015 dropping to 69.4 million cubic metres in 2019 and 67 million cubic metres in 2020 - which is summarised on the [[Hazardous Landfill]] page). Note that Non-Hazardous Landfill also provides [[Landfill]] capacity for [[Inert Waste]] in the sense that these waste are used for daily cover and site engineering purposes.
The capacity of Non-Hazardous Landfill is reported<ref>[https://data.gov.uk/dataset/237825cb-dc10-4c53-8446-1bcd35614c12/remaining-landfill-capacity EA Remaining Landfill Capacity]</ref> by the [[EA]] for England and is summarised in the graph and table below, but it excludes that capacity of Non-Hazardous Landfill with a Stabilised Non-Reactive Hazardous Waste cell (which comprised 89.4 million cubic metres in 2015 dropping to 69.4 million cubic metres in 2019 and 67 million cubic metres in 2020 - which is summarised on the [[Hazardous Landfill]] page). Note that Non-Hazardous Landfill also provides [[Landfill]] capacity for [[Inert Waste]] in the sense that these waste are used for daily cover and site engineering purposes.


Line 77: Line 81:
|}
|}


==Non-Hazardous Landfill Capacity==
===England by Region===
===England===
All data 2020<ref>[https://data.gov.uk/dataset/237825cb-dc10-4c53-8446-1bcd35614c12/remaining-landfill-capacity EA Remaining Landfill Capacity]</ref>.  Please note that the "Number of Sites" in the table below relates to those sites that have returned a reported void. This figure does not necessarily correspond to the total number of sites in a region.
All data 2020<ref>[https://data.gov.uk/dataset/237825cb-dc10-4c53-8446-1bcd35614c12/remaining-landfill-capacity EA Remaining Landfill Capacity]</ref>.


{{#clear_external_data:}}
{{#clear_external_data:}}
Line 101: Line 104:


===Scotland===
===Scotland===
All Data for 2019, owning to a cyber attack at [[SEPA]] there is currently no 2020 data.
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data:
{{#get_db_data:
Line 120: Line 124:
|}
|}
===Wales===
===Wales===
Void data for 2018 for wales, Site Count Data is 2020.
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data:
{{#get_db_data: