Residual Waste EFW: Difference between revisions
Arctellion (talk | contribs) →In Planning EfW: Updated tables Tags: Mobile edit Mobile web edit |
Arctellion (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit |
||
| Line 147: | Line 147: | ||
The following list summarizes all [[EfW]] sites that were in the planning process as at January 2020, with summary 'plated capacity' shown in the table which totals '''21,893,400 tonnes'''. In the case of Lakeside this planned capacity replaces the existing site. No comment or note is made on those plants whose planning consent may have expired due to not being implemented within consented time limits, or the likelihood of them moving from this stage into construction, noting that the 'plated capacity' far exceeds the reported [[Residual Waste]] available to support them in the UK. | The following list summarizes all [[EfW]] sites that were in the planning process as at January 2020, with summary 'plated capacity' shown in the table which totals '''21,893,400 tonnes'''. In the case of Lakeside this planned capacity replaces the existing site. No comment or note is made on those plants whose planning consent may have expired due to not being implemented within consented time limits, or the likelihood of them moving from this stage into construction, noting that the 'plated capacity' far exceeds the reported [[Residual Waste]] available to support them in the UK. | ||
[[File:Efwplan.png|600px|right|EfW Sites within UK in Planning]] | [[File:Efwplan.png|600px|right|EfW Sites within UK in Planning]] | ||
=== | ===In Planning=== | ||
{|Class="wikitable" | {|Class="wikitable" | ||
! ID !! Site Name !! Capacity (kt) | ! ID !! Site Name !! Capacity (kt) | ||
| Line 157: | Line 157: | ||
}} | }} | ||
|} | |} | ||
===In Consultation=== | ===In Consultation=== | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||