Residual Waste EFW: Difference between revisions

Bin52 (talk | contribs)
m add new link
Bin52 (talk | contribs)
mNo edit summary
Line 36: Line 36:
* ID item 3 has multiple line entries - the capacity of all entries is shown once in the first line, consolidating the later ones and resulting in a 0 entry for those consolidated.
* ID item 3 has multiple line entries - the capacity of all entries is shown once in the first line, consolidating the later ones and resulting in a 0 entry for those consolidated.
* ID item 29 [[Sinfin Lane]] has been removed from the operational sites as is reported as presently mothballed.
* ID item 29 [[Sinfin Lane]] has been removed from the operational sites as is reported as presently mothballed.
* ID item 64 [[Ratty's Lane Sustainable Energy Facility (ACT)]], also known as Hoddesdon, was reported in January 2022 that it would be moving into a mothballed status imminently<ref>[https://www.endswasteandbioenergy.com/ewb-weekly?utm_medium=EMAIL&utm_campaign=eNews%20Bulletin&utm_source=20220131&utm_content=EWB%20Waste%20and%20Bioenergy%20Weekly%20(12)::&email_hash= ENDS Article 31st January 2022]</ref>..
* ID item 64 [[Ratty's Lane Sustainable Energy Facility (ACT)]], also known as Hoddesdon, was reported in January 2022 that it would be moving into a mothballed status imminently<ref>[https://www.endswasteandbioenergy.com/ewb-weekly?utm_medium=EMAIL&utm_campaign=eNews%20Bulletin&utm_source=20220131&utm_content=EWB%20Waste%20and%20Bioenergy%20Weekly%20(12)::&email_hash= ENDS Article 31st January 2022]</ref>.


The map, to the right of the listing, contains the locations of all the sites listed above - please note that due to scale and cartographic limitations some of the numbers in the list might not be shown on the map due to sites being in close proximity, or sites in areas of high density. This does not mean that the site marker is not there. An example of this is [[Ferrybridge Multifuel 1 (FM1)]] and [[Ferrybridge Multifuel 2 (FM2)]] as both are in geographically similar locations, being a few 100m apart, and as a result the location markers will appear on top of each other, and as a result one will block the other's numerical id. This also applies to the following maps on sites in construction and planning.
The map, to the right of the listing, contains the locations of all the sites listed above - please note that due to scale and cartographic limitations some of the numbers in the list might not be shown on the map due to sites being in close proximity, or sites in areas of high density. This does not mean that the site marker is not there. An example of this is [[Ferrybridge Multifuel 1 (FM1)]] and [[Ferrybridge Multifuel 2 (FM2)]] as both are in geographically similar locations, being a few 100m apart, and as a result the location markers will appear on top of each other, and as a result one will block the other's numerical id. This also applies to the following maps on sites in construction and planning.
Line 156: Line 156:
Summary site information collated from a variety of sources including: Monksleigh<ref name="monk" />, Tolvik<ref name="tolv" />, [[EA]], [[SEPA]], [[NRW]], [[DEFRA]], [[BEIS]], [[UKWIN]] and owner and developer websites</small>
Summary site information collated from a variety of sources including: Monksleigh<ref name="monk" />, Tolvik<ref name="tolv" />, [[EA]], [[SEPA]], [[NRW]], [[DEFRA]], [[BEIS]], [[UKWIN]] and owner and developer websites</small>


* ID item 46 was been reported in January 2022 as possibly affected by the financial troubles being experienced by [[CNIM Environment & Energy EPC]].
* ID item 46 was reported in January 2022 as possibly affected by the financial troubles being experienced by [[CNIM Environment & Energy EPC]].
* ID item 148 has also been reported as being affected for the same reasons<ref>[https://www.endswasteandbioenergy.com/ewb-weekly?utm_medium=EMAIL&utm_campaign=eNews%20Bulletin&utm_source=20220131&utm_content=EWB%20Waste%20and%20Bioenergy%20Weekly%20(12)::&email_hash= ENDS Article 31st January 2022]</ref>.
* ID item 148 has also been reported as being affected for the same reasons<ref>[https://www.endswasteandbioenergy.com/ewb-weekly?utm_medium=EMAIL&utm_campaign=eNews%20Bulletin&utm_source=20220131&utm_content=EWB%20Waste%20and%20Bioenergy%20Weekly%20(12)::&email_hash= ENDS Article 31st January 2022]</ref>.
* ID item 47 was reported as entering into operational status in January 2022<ref>[https://www.letsrecycle.com/news/covanta-begins-rookery-south-operations/ Letsrecycle.com Article]</ref>.
* ID item 47 was reported as entering into operational status in January 2022<ref>[https://www.letsrecycle.com/news/covanta-begins-rookery-south-operations/ Letsrecycle.com Article]</ref>.