Incinerator Bottom Ash: Difference between revisions

From WikiWaste
No edit summary
(Added graph)
Line 6: Line 6:


Currently, over half a million tonnes of IBA goes to landfill each year in England and Wales. However, as recovery processes have improved this material can now be processed and recycled back into applications such as aggregate replacement for sub-base road construction, bulk fill, concrete block manufacture or concrete grouting<ref name="foo" />.
Currently, over half a million tonnes of IBA goes to landfill each year in England and Wales. However, as recovery processes have improved this material can now be processed and recycled back into applications such as aggregate replacement for sub-base road construction, bulk fill, concrete block manufacture or concrete grouting<ref name="foo" />.
The graph below displays the incinerator bottom ash produced as a percentage of the total [[residual waste]] feedstock being processed by UK [[Energy from Waste]] facilities, and how this has changed over recent years.
[[File:IBA production from EfWs.png|800px|frame|center|IBA produced from Energy from Waste processes, Graph derived from Tolvik, 2019<ref>Tolvik Consulting, 2019. [https://www.tolvik.com/wp-content/uploads/2019/06/Tolvik-EfW-Statistics-2018-Report_July-2019-final-amended-version.pdf UK Energy from Waste Statistics – 2018. Gloucestershire.][online] </ref>.]]


==Authorities Disposing of Over 2000t==
==Authorities Disposing of Over 2000t==

Revision as of 04:33, 10 December 2019

The ash resulting from the controlled combustion of waste, in the UK primarily MSW. Not to be confused with Flue Gas APC Residues cleaning residues or boiler (tube) ash. IBA generally represents around 20% of the input material by weight[1].

Following the combustion process non-combustible ash of varying particle size is produced, often containing mineral material and metals. The ash which falls to the bottom of the process is typically dry and dusty and operators will need to ensure that it is appropriately stored in covered containers to prevent emissions to air[1].

Currently, over half a million tonnes of IBA goes to landfill each year in England and Wales. However, as recovery processes have improved this material can now be processed and recycled back into applications such as aggregate replacement for sub-base road construction, bulk fill, concrete block manufacture or concrete grouting[1].

The graph below displays the incinerator bottom ash produced as a percentage of the total residual waste feedstock being processed by UK Energy from Waste facilities, and how this has changed over recent years.

IBA produced from Energy from Waste processes, Graph derived from Tolvik, 2019[2].


Authorities Disposing of Over 2000t